Design Update February 2011

The following drawings represent portions of the Middle School as well as portions of the Town of Warman Recreation and Culture Center. 

 The Prairie Spirit School Division and the Town of Warman have entered into a partnership to share spaces within each of the middle school and the recreation- culture complex. 

The school division has leased from the town one of the indoor soccer pitches to be used as the school gym.  This space is comparable to three full sized gyms.  School space allotment not being designated for a gym can then be used to build a fine arts theater and music room.  Community members and groups will have access to the use of the theatre and music room. 

Students will have access and use of portions of the Recreation and Culture Complex during school hours.  During lunch students and staff will have the option to use town cafeteria facilities and the corridors connecting the two buildings.  School bus drop off will be at the recreation complex entry end while individual parent and visitor drop off will be at the school entry end.

Plans are being worked on to have the Wheatland Library located within the school library making it accessible during and after school hours.   

Click on drawing to enlarge 

Site Drawing for School

Floor Plan – Main Floor

Floor Plan – Second Floor

Leave a Reply